WAK Consultants have provided project support for a multitude of projects throughout Asia. We bring many years of hands-on experience and expertise and have provided a portfolio of professional services. WAK has helped partner/clients across a wide range of sectors in achieving higher levels of performance and long lasting results.

Year Architect / Consultants
Companies
Name of Client /
Main Contractor
Description of Work
American Consultant ORCL Repairs to World Trade Centre Colombo, Bomb Damage
Board of Governors-Tanglin Tanglin School Tanglin School Roof
LTA C704 Kumagai/Sembcorp QA/QC Procedures for Segment Coating
Micheal Marsterton British Club British Club ・Swimming Pool
LTA C706 Redland Precast QA/QC Procedures for Segment Coating
Nishimatsu ・ Changi Terminal Hume Inds Johore Bahru Testing of concrete tunnel segment
PUB Sunway Juarasama QA/QC Procedures for Coating to Upper Pierce Reservoir
CH2M / DTSS Redland Precast Repair Consultants to Redland
Robinson Jones Associates Rhodo Property Draycot Condominium ・Injection to Basement
PUB Jurong Readymix / Lumchang Waterproof Concrete
PUB Jurong Readymix/ Lumchang CWRP ・Foamed Grouting / Tunnel / Pipeline Annulus 0
PUB OEM / Sembcorp Waterproof Concrete / HPC
LTA Zublin DTSS T06 ・Foamed Grout / TB Service Shaft
PUB Lum Chang Building Contractors Pte LTd Corrosion Protection Lining System (Konusit KK 10/KK30) ・CWRP
LTA Nishimatsu Construction Waterproof concrete for Circle Line Stations and cut & cover tunnel. MRT CL 823
LTA Taisei Corporation Waterproof concrete for Circle Line Stations and cut & cover tunnel. MRT CL 854
LTA Woh Hup / STE / AM Waterproof concrete for Circle Line Stations and cut & cover tunnel. MRT CL 855
LTA Great Earth / Sato Koyo MRT Extension C1280 ・Base Slab
PUB Jurong Readymix Punggol Dam Contract C1 ・Punggol Dam
PUB Jurong Readymix Punggol Dam Contract C2 ・Punggol Dam
2011 LTA Alpine DTL C918 ・Bukit Timah Road ・GMP (Grout Mix Pile)
2012 LTA Alpine DTL C917 ・Bukit Timah Road (Break in/out of Tunnel) ・Fissure Grout / TAM Grout
2012 LTA Alpine DTL C917 ・Fissure Grout to treat under driven Diaphragm Wall in Rock formation
2012 LTA Penta Ocean Construction C485 ・Injection   Grouting / Seal water seepage soffit and floor slab
2013 LTA Lum Chang Building Contractors Pte Ltd C912 ・Design   Construction of Station at Bukit Panjang  Tunnels for Downtown Line Stage 2 ・Fissure Grouting
2013 LTA Alpine DTL C918 ・Tan Kah Kee Station Create Umbrella Grouting ・TaM Grout : i) MFC ii) Gels
2013 LTA GS E   C C913 ・Cashew Station In Line Sump Pump Grouting
2014 LTA McConnell Dowell C917A・KAP Station Vent Shaft ・Water Leakage Repair Works Void Filling  TaM Grouting C917A・SAV Station D/Wall leaks   Repair
2014 LTA SK E C DTL 2 C918A・TBM 604 / TBM 605 Pressure injection of Chemicals and Gels
2014 LTA SK E C C918A TKK   CCT Station Fissure grouting to SBP piles
2015 Exxon Mobil Fibrwrap Exxon Mobil ・ Pressure grouting to jetty piles.
2015 Power Grid Leighton John Holland JV T208 ・Fissure/TaM/Chemical grouting to Grout Block.
2015 Power Grid SK E C EW2 ・Transmission Cable Tunnel, PU   Gel grouting to Dunearn Shaft
On-going LTA Leighton John Holland JV T208 ・Toe / Cap /Fissure grouting to Intervention Block and Diaphragm Wall
On-going LTA Tiong Seng Donga JV T220 ・Toe / Cap /Fissure grouting to station Diaphragm Wall

.